CIVIL ESTIMATING AND COSTING II

UNIT III

3.1 ANALYSIS OF RATES FOR SANITARY AND WATER SUPPLY WORKS
EARTH WORK IN TRENCHES – TIMBERING OF TRENCHES –LAYING
STONEWARE / RCC / GI PIPES – LEAD JOINT FOR CAST IRON PIPES
-CUTTING AND JOINTING G.I. PIPES , PVC PIPES AND STONEWARE
PIPES – CONSTRUCTING A MAN HOLE IN THE SEWAGE LINE OF A
RESIDENCE -PROVIDING A DISPERSION TRENCH FOR THE SEPTIC
TANK OF A RESIDENTIAL FLAT– SUPPLYING A FERRO CEMENT
CIRCULAR RING FOR WELL SINKING – LAYING PVC PLUMBING LINES
CONCEALED INTO BRICK MASONRY WALLS – SUPPLYING AND FIXING
INDIAN TYPE WATER CLOSETS WITH FLUSHING TANKSP
3.2 ANALYSIS OF RATES FOR BRIDGE, ROAD WORKS AND
MISCELLANEOUS ITEMS
RANDOM RUBBLE STONE MASONRY IN ABUTMENTS AND PIERS –
PROVIDING FORMWORK FOR DECK SLABS – R.C.C FOR COLUMNS /
BEAMS / DECK SLAB –PARAPETS – HAND RAILS – EARTH FILLING IN
EMBANKMENTS –SOLING FOR A WB MROAD – LAYING WBM ROAD
OVER THE EXISTING SOLING – SURFACE DRESSING – SURFACE
BLINDING – PROVIDING PREMIX CARPET – LAYING CONCRETE ROADS
– APRON AND REVETMENT WORKS IN CANALS – WOODEN FRAMES
FOR DOORS – PANELED DOORS – GLAZED WINDOWS – STEEL GRILL
GATES – STEEL GRILLS FOR WINDOWS – SUPPLYING AND FIXING
ALUMINUM PARTITIONS – PROVIDING WOODEN SHUTTERS TO LOFTSEXPANSION JOINT IN R.C ROOF ( EXPOSURE TO USE