CIVIL ESTIMATING AND COSTING – I

UNIT III

3.1 ANALYSIS OF RATES
ANALYSIS OF RATES OR PREPARATION OF DATA FOR THE FOLLOWING
BUILDING WORKS USING STANDARD DATA BOOK:
1) CEMENT/ LIME MORTARS; 2) PLAIN CEMENT CONCRETE IN
FOUNDATION/ LEVELING COURSE; 3) FLOORING WITH CEMENT
CONCRETE, PLASTERED WITH CEMENT MORTAR; 4) FLOORING WITH
PCC FINISHED WITH ELLIS PATTERN CEMENT CONCRETE SURFACE; 5)
FLOORING WITH CUDDAPA SLABS; 6) MOSAIC/ CERAMIC TILED
FLOORING; 7) BRICKWORK IN CEMENT MORTAR IN FOUNDATION; 8)
BRICKWORK IN CM IN SUPER STRUCTURE; 9) BRICKWORK IN CM IN
PARTITION WITH PLASTERING; 10) RANDOM RUBBLE MASONRY IN CM;
11) COURSED RUBBLE MASONRY IN CM; 12) LIME-SURKI CONCRETE IN
WEATHERING COURSE FINISHED WITH PRESSED TILES IN CM; 13)
REINFORCED CEMENT CONCRETE IN SLABS (PER UNIT VOLUME/UNIT
AREA); 14) R.C.C IN BEAMS; 15) R.C.C IN COLUMNS; 16) R.C.C IN
SUNSHADES; 17) PLASTERING BRICK MASONRY WITH CM; 18)
POINTING STONE MASONRY WITH CEMENT MORTAR; 19) PAINTING THE
WOOD WORK; 20) PAINTING STEEL WORK; 21) WHITE/ COLOUR
WASHING THE PLASTERED SURFACES; 22) FORM WORKS (STRUTTING,
CENTERING, SHUTTERING ETC) FOR SLABS/BEAMS/ COLUMNS 23)
FABRICATION OF STEEL REINFORCEMENT; 24) A.C SHEET ROOFING;
25) SUPPLYING AND FIXING RAIN WATER PIPES – EXERCISES