The construction of routes for internal water supply and sewerage networks is carried out by Renga’s unique tool “Automatic routing”. He independently performs the laying of pipelines, as well as connecting equipment to them in accordance with the rules that the engineer sets. In a special mode called “System Designer”, the user shows the sequence of connecting objects, sets the offset from the level of the floor and walls, and in parallel with his actions, the corresponding water supply / drainage route is built in the model. Pipes and fittings specified by the designer are automatically assigned to it, which are inserted at the places of rotation and branches. 